BLUE WATER BRIDGE COMMISSION ADMINISTRATIVE BUILDING
Location: POINT EDWARD, ONTARIO
Project Team:
Owner: | Blue Water Bridge Commission |
Architect: | Norr Partnership |
Structural Engineer: | Norr Partnership |
General Contractor: | McKay Cocker |
Steel Fabricator: | Tresman Steel Industries Ltd. |
Steel Detailer: | Baseline Drafting |
Project Description:
This project is a $55 million commercial and administration building for the Blue Water Bridge Authority in Point Edward, Ontario. The facility is made up of four floors and a mechanical penthouse.
The building design consists of structural steel columns, composite floor system and structural steel moment frames providing lateral stability to the building. Tresman Steel fabricated and installed approximately 1000 tons of structural steel for this project.
The building design consists of structural steel columns, composite floor system and structural steel moment frames providing lateral stability to the building. Tresman Steel fabricated and installed approximately 1000 tons of structural steel for this project.