Tresman Steel
Over 40 Years in business
Get in touch
with one of our representatives

PROJECTS / Commercial & Institutional

Previous ProjectNext Project

DON MILLS CENTRE REDEVELOPMENT
Location:  TORONTO, ONTARIO
Project Team:
Owner:  Cadillac Fairview
Architect: Pellow and Associates Architects
Structural Engineer: Reed Jones Christoffersen
General Contractor: Ellis Don Construction
Steel Fabricator: Tresman Steel Industries Ltd.
Steel Detailer: Tresman Steel Industries Ltd / M&G Steel
Steel Erector:  KC Welding
Web Link: 
Project Description:
The owner's plan for this project was to create a revitalized shopping destination that included a central space, or town square, surrounded by retail, residential, office and other commercial uses. MGT Steel played a critical role in the plan by fabricating and erecting the steel for eleven new buildings on the site. The total weight for the project was 2100 tons. Tresman Steel, along with our joint venture partner M&G Steel, each fabricated 1050 tons of steel.