Tresman Steel
Over 40 Years in business
Get in touch
with one of our representatives

PROJECTS / Commercial & Institutional

Previous ProjectNext Project

DURHAM COLLEGE CAMPUS RECREATION AND WELLNESS CENTRE OSHAWA, ONTARIO.
Project Team:
Owner: Durham College
Architect: Barry-Bryan Associates
Structural Engineer: Barry-Bryan Associates
General Contractor: Peak Engineering
Steel Fabricator: Tresman Steel Industries Ltd.
Steel Detailer: Tresman Steel Industries Ltd.
Steel Erector: Island Steel Erectors
Project Description:
The 90,000 square foot Campus Recreation and Wellness Centre expansion opened in June 2007. It offers a 28,000 square-foot triple gymnasium with areas for volleyball, basketball and badminton, a 10,000 square-foot fitness centre, and an outstanding Campus Health Centre.

Tresman Steel supplied and installed 500 tons of structural steel and joist for this project. A majority of the steel was dedicated to new construction adjacent to the existing recreation facility. A smaller portion of the work was inside the existing facility where reinforcing was required.