Tresman Steel
Over 40 Years in business
Get in touch
with one of our representatives

PROJECTS / Commercial & Institutional

Previous ProjectNext Project

TORONTO PREMIUM OUTLETS MILTON, ONTARIO
Project Team:
Owner: Calloway Real Estate Investment Trust / Simon Property Group
Architect: The Collaborative Inc.
Structural Engineer: IRC McCavour Engineering Group
General Contractor: PCL Construction
Steel Fabricator: Tresman Steel Industries Ltd.
Steel Detailer: DTI Group / Baseline Drafting
Steel Erector: GLA Steel Erectors / KC Welding
Web Link: 
Project Description:
Toronto Premium Outlets is a collection of 89 retail outlet stores spread over 360,000 square feet. Stores range in size from 600 square feet to 25,000 square feet. Tresman Steel supplied and installed 1700 Tons of structural steel and joist for this project.