Tresman Steel
Over 40 Years in business
Get in touch
with one of our representatives

PROJECTS / Industrial Steel Buildings

Previous ProjectNext Project

UNILEVER DISTRIBUTION CENTRE BRAMPTON, ONTARIO
Project Team:
Owner: H&R REIT
Architect: Glenn Piotrowski Architect Ltd.
Structural Engineer:  Dorlan Engineering
General Contractor: Giffels Corporation
Steel Fabricator: Tresman Steel Industries Ltd.
Steel Detailer:  Baseline Drafting
Steel Erector: St. Peter Steel Erectors
Project Description:
This 780,000 square feet distribution facility is located in Brampton at 7900 Airport Road. The building features 36’-0” clear height, 107 loading dock doors and a grid spacing of 50’ x 55’-6”.

Tresman Steel will supply and install approximately 2000 Tons of structural steel and joist for this project. All steel shipped to the site will meet LEED requirements for recycled content and regional content.