Tresman Steel Industries Ltd. supplied and installed approximately 855 tons of structural steel for a project spanning 120,000 square feet of gross floor area. The facility includes a crane runway with two 5MT capacity cranes, another runway with three 7.5MT capacity cranes, and an underhung crane runway. All steel components were shop-primed in white at our paint facility
General Contractor
Magil Construction Canada Inc.
Structural Engineer
SPH Engineering Inc.
Architect
SPH Engineering Inc.
Owner
Mitsui High-Tec Canada Inc.