top of page
![Tresman Logo version1.jpg](https://static.wixstatic.com/media/349b5a_ac29f1a669b8457eb7e91d2f4e3e2078~mv2.jpg/v1/fill/w_980,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Tresman%20Logo%20version1.jpg)
Tresman Steel Industries Ltd. supplied and installed approximately 855 tons of structural steel for a project spanning 120,000 square feet of gross floor area. The facility includes a crane runway with two 5MT capacity cranes, another runway with three 7.5MT capacity cranes, and an underhung crane runway. All steel components were shop-primed in white at our paint facility
General Contractor
Magil Construction Canada Inc.
Structural Engineer
SPH Engineering Inc.
Architect
SPH Engineering Inc.
Owner
Mitsui High-Tec Canada Inc.
bottom of page