The warehouse facility is designed as a cross-dock operation with the potential for up to four tenancies. It features half-height precast exterior walls with insulated metal panels above. Exit doors are spaced 60 meters (196’-10”) apart around the perimeter, and loading dock doors are approximately 14 feet on center, providing at least 207 loading dock positions and four drive-in doors. A 51,200 square-foot footprint is allocated for potential office space in the four building corners.
The project is targeting LEED Gold certification and meets the Zero Carbon Building (ZCB) Design Standard, a framework for designing low-carbon, energy-efficient buildings that can potentially achieve zero carbon emissions when operational.
MGT Steel Ltd. supplied and installed approximately 2,740 tons of structural steel, 1,800 tons of open-web steel joists (OWSJ), and 1,258,065 square feet of metal decking. The project covers a gross floor area of 1,255,915 square feet, including warehouse and office spaces.
General Contractor
TriAxis Construction Limited
Structural Engineer
Dorlan Engineering
Architect
Glenn Piotrowski Architect
Owner
537 Kingston Road East (Ajax) Holding ULC