top of page
Tresman Steel Industries Ltd. supplied and installed approximately 2,000 tons of structural steel and open-web steel joists (OWSJ) for a project comprising three warehouse buildings with precast walls. Building 1 spans 158,000 square feet, while Buildings 2 and 3 each cover 120,000 square feet.
General Contractor
Leeswood Construction
Structural Engineer
Gravity Engineering
Architect
Ware Malcomb
Owner
QuadReal
bottom of page